Aerial Bomb PGK

  • Aerial Bomb PGK
  • Aerial Bomb PGK
  • Aerial Bomb PGK

Product Overview:

Aerial Bomb PGK

Aerial Bomb Operational Process
Mount the PGK assembly using dedicated fixtures.
Input data to generate release points and mission parameters.
Load the bomb, activate the guidance system, and disable safeties.
The pilot deploys the bomb;
Fins deploy during descent, enabling glide navigation and terminal dive to the target.

Details





 

Send a Message

©2025 Xi'an Guanhua Defense Technology Co.,Ltd Sitemap